Crucial place for shear on vertical area across full width of pile-cap happens at distance from face of column offered by:After the piles are selected as the shape of foundation for use in accordance Using the instructions supplied in the geotechnical study report, an evaluation in the needed number of piles must be completed. The capacity from th